Specific Well--15-095-22109-0002
Engineering Data | ||
View General Well Data | Viewing Engineering Data |
API: 15-095-22109-0002
KID: 1046728833 Lease: SIMONS Well: 3-22 Original operator: Vincent Oil Corporation Current operator: Vincent Oil Corporation Field: Location: T28S R8W, Sec. 22 E2 NE NE 4470 North, 330 West, from SE corner NAD27 Longitude: -98.1730356 NAD27 Latitude: 37.601395 NAD83 Longitude: -98.1733788 NAD83 Latitude: 37.6014114 Lat-long calculated from footages |
County: Kingman
Permit Date: Spud Date: Mar-14-2017 Completion Date: Mar-16-2017 Plugging Date: Well Type: GAS Status: Converted to SWD Well Total Depth: 4580 Elevation: 1604 KB Producing Formation: IP Oil (bbl): IP Water (bbl): IP GAS (MCF): KDOR code for Gas: 229449 KCC Permit No.: |
View well on interactive map
View well in the Walter’s Digital Library (WDL login required) |
Drill Stem Tests Taken: No Samples Set to Survey: No Cores Taken: No Electric Logs Run: No Method of Completion: Perforated Date of First or Resumed Production/Injection: Mar. 16, 2017 |
Producing Method: Flowing Estimated production per 24 hours Oil: Water: 60 Gas: 20 Disposition of Gas: Sold Tubing record Size: 2.3750 Set at: 4246 Packer at: Production intervals: 4055 ; 4063 |
Casing recordnew or used? New |
|||||||
Purpose of String | Size Hole Drilled |
Size Casing Set (in O.D.) |
Weight Lbs/Ft |
Setting Depth |
Type of Cement |
# Sacks Used |
Type and Percent Additives |
---|---|---|---|---|---|---|---|
Surface | 12.25 | 8.625 | 23 | 292 | 60/40 POZ | 400 | 2% Gel, 3% CC |
Production | 7.875 | 5.5 | 14 | 4579 | ASC | 175 | 5# Kol-seal/sx |
Additional Cementing/Squeeze Recordpurpose? |
|||||||
Depth Top Bottom |
Type of Cement | # Sacks Used | Type and Percent Additives |
---|
Perforation Record |
|||||||
Shots Per Foot | Perforation Top |
Perforation Bottom |
Bridge Plug Type |
Bridge Plug Set At |
Material Record | ||
---|---|---|---|---|---|---|---|
4 | 4534 | 4560 | Existing Arbuckle injection perforations | ||||
4 | 4430 | 4453 | Existing Simpson Injection perforations | ||||
CIBP Cast Iron Bridge Plug | 4510 | 3/14/2017 set CIBP @ 4510', ran tubing to 4496' & swab 20 bbls water w/ slight show of oil, SDFN | |||||
3/15/2017 swab 20 bbls/hr w/ trace oil, rec 162 bbls Water, SDFN | |||||||
3/16/2018, FL at 1500', swab 20 bbls w/ trace oil; pulled tubing | |||||||
CIBP Cast Iron Bridge Plug | 4300 | 3/16/2017 set CIBP at 4300', ran SN & 132 joints of 2.3750 tubing, set at 4246'. | |||||
4 | 4055 | 4063 | Existing Mississippian production perfs open, 3/16/2017 ran BHP & rods, started unit and turned well to gas production. |
Please note: The link below takes you away from the web site of the Kansas Geological Survey to the website of the Kansas Geological Society, a library in Wichita. The Survey can not help with information presented by the Walters Digital Library.
From Kansas Geological Society's Walters Digital Library