Specific Well--15-081-22183-0100
Engineering Data | ||
View General Well Data | Viewing Engineering Data |
API: 15-081-22183-0100
KID: 1046850296 Lease: GOERING JACOB Well: M3H Original operator: Merit Energy Company, LLC Current operator: Merit Energy Company, LLC Field: Eubank Location: T28S R34W, Sec. 16 SE NE NE NW 426 South, 2488 East, from NW corner NAD27 Longitude: -101.0445252 NAD27 Latitude: 37.6189394 NAD83 Longitude: -101.0449718 NAD83 Latitude: 37.6189631 Lat-long calculated from footages |
County: Haskell
Permit Date: Oct-08-2018 Spud Date: Oct-17-2018 Completion Date: Nov-17-2018 Plugging Date: Well Type: OIL Status: Producing Total Depth: 6343 Elevation: 3061 KB Producing Formation: MORROW IP Oil (bbl): IP Water (bbl): IP GAS (MCF): KDOR code for Oil: 147288 KDOR code for Gas: 234759 KCC Permit No.: |
View well on interactive map
View well in the Walter’s Digital Library (WDL login required) |
Drill Stem Tests Taken: No Samples Set to Survey: Yes Cores Taken: No Electric Logs Run: No Method of Completion: Perforated Date of First or Resumed Production/Injection: Nov. 17, 2018 |
Producing Method: Flowing Estimated production per 24 hours Oil: 15.4 Water: 370 Gas: Disposition of Gas: Tubing record Size: 2.8750 Set at: 5350 Packer at: Production intervals: 6118 ; 6594 |
Casing recordnew or used? New |
|||||||
Purpose of String | Size Hole Drilled |
Size Casing Set (in O.D.) |
Weight Lbs/Ft |
Setting Depth |
Type of Cement |
# Sacks Used |
Type and Percent Additives |
---|---|---|---|---|---|---|---|
Surface | 12.25 | 8.625 | 24 | 1810 | A-CON | 525 | See Attached |
Production | 7.875 | 5.5 | 17 | 6733 | Class H | 560 | See Attached |
Additional Cementing/Squeeze Recordpurpose? |
|||||||
Depth Top Bottom |
Type of Cement | # Sacks Used | Type and Percent Additives |
---|
Perforation Record |
|||||||
Shots Per Foot | Perforation Top |
Perforation Bottom |
Bridge Plug Type |
Bridge Plug Set At |
Material Record | ||
---|---|---|---|---|---|---|---|
2 | 6118 | 6120 | Morrow LIme / Frac- 3576 bbls, total 30/50 flowpro 150,227 lbs total N2 5,055,000 SCF | ||||
2 | 6130 | 6132 | " " ' " | ||||
2 | 6136 | 6138 | " " ' " | ||||
2 | 6154 | 6156 | " " ' " | ||||
2 | 6556 | 6558 | Morrow Lime / Frac- total load 2547 bbls, total 30/50 flopro 150,102 lbs, total N2 5,950,000 SCF | ||||
2 | 6568 | 6570 | |||||
2 | 6580 | 6582 | |||||
2 | 6592 | 6594 |
Please note: The link below takes you away from the web site of the Kansas Geological Survey to the website of the Kansas Geological Society, a library in Wichita. The Survey can not help with information presented by the Walters Digital Library.
From Kansas Geological Society's Walters Digital Library