|
|
|
Specific Well--15-091-24530
Engineering Data |
|
|
| View General Well Data | Viewing Engineering Data |
|
API: 15-091-24530
KID: 1052453810 Lease: FASOLINO Well: HB I4 Original operator: HB Energy LLC Current operator: HB Energy LLC Field: Prairie Center Location: T14S R22E, Sec. 4 SW SW SW 57 North, 4868 West, from SE corner NAD27 Longitude: -94.9812361 NAD27 Latitude: 38.8550432 NAD83 Longitude: -94.981482 NAD83 Latitude: 38.855052 Lat-long from GPS |
County: Johnson
Permit Date: May-06-2022 Spud Date: Aug-25-2022 Completion Date: Aug-26-2022 Plugging Date: Well Type: EOR Status: Authorized Injection Well Total Depth: 874 Elevation: 984 KB Producing Formation: BARTLESVILLE IP Oil (bbl): IP Water (bbl): IP GAS (MCF): KCC Permit No.: |
|
View well on interactive map
View well in the Walter's Digital Library (WDL login required) | |
|
Drill Stem Tests Taken: No Samples Set to Survey: No Cores Taken: No Electric Logs Run: Yes Gamma ray/Neutron/CCL Method of Completion: Perforated Date of First or Resumed Production/Injection: |
Producing Method: Estimated production per 24 hours Oil: Water: Gas: Disposition of Gas: Tubing record Size: Set at: Packer at: Production intervals: 812 ; 817 |
Casing recordnew or used? Used |
|||||||
| Purpose of String | Size Hole Drilled |
Size Casing Set (in O.D.) |
Weight Lbs/Ft |
Setting Depth |
Type of Cement |
# Sacks Used |
Type and Percent Additives |
|---|---|---|---|---|---|---|---|
| Surface | 9.875 | 7 | 17 | 20 | Portland | 10 | na |
| Production | 5.875 | 2.875 | 6.5 | 860 | Econobond | 102 | na |
Additional Cementing/Squeeze Recordpurpose? |
|||||||
| Depth Top Bottom |
Type of Cement | # Sacks Used | Type and Percent Additives | ||||
|---|---|---|---|---|---|---|---|
Perforation Record |
|||||||
| Shots Per Foot | Perforation Top |
Perforation Bottom |
Bridge Plug Type |
Bridge Plug Set At |
Material Record | ||
|---|---|---|---|---|---|---|---|
| 3 | 812 | 817 | |||||