|
|
|
Specific Well--15-031-24667
Engineering Data |
|
|
| View General Well Data | Viewing Engineering Data |
|
API: 15-031-24667
KID: 1053367244 Lease: LIPSEY Well: 26 Original operator: Colt Energy Inc Current operator: RJ Energy, LLC Field: Neosho Falls-Leroy Location: T23S R16E, Sec. 2 SE NW NE SW 2158 North, 1668 East, from SW corner NAD27 Longitude: -95.6223088 NAD27 Latitude: 38.0737115 NAD83 Longitude: -95.622571 NAD83 Latitude: 38.0737396 Lat-long calculated from footages |
County: Coffey
Permit Date: Jul-06-2023 Spud Date: Aug-16-2023 Completion Date: Sep-20-2023 Plugging Date: Well Type: OIL Status: Producing Total Depth: 1035 Elevation: 988 KB Producing Formation: IP Oil (bbl): IP Water (bbl): IP GAS (MCF): KDOR code for Oil: 100996 KCC Permit No.: |
|
View well on interactive map
View well in the Walter's Digital Library (WDL login required) | |
|
Drill Stem Tests Taken: No Samples Set to Survey: No Cores Taken: No Electric Logs Run: Yes GRN Method of Completion: Perforated Date of First or Resumed Production/Injection: Oct. 03, 2023 |
Producing Method: Pumping Estimated production per 24 hours Oil: Water: Gas: Disposition of Gas: Tubing record Size: 2.375 Set at: 976 Packer at: None Production intervals: 966 ; 975 |
Casing recordnew or used? New |
|||||||
| Purpose of String | Size Hole Drilled |
Size Casing Set (in O.D.) |
Weight Lbs/Ft |
Setting Depth |
Type of Cement |
# Sacks Used |
Type and Percent Additives |
|---|---|---|---|---|---|---|---|
| Surface | 12.25 | 8.625 | 24 | 40 | H325 | 30 | None |
| Production | 6.75 | 4.5 | 10.5 | 1019 | Thixotropic | 125 | 2#/sx phenoseal |
Additional Cementing/Squeeze Recordpurpose? |
|||||||
| Depth Top Bottom |
Type of Cement | # Sacks Used | Type and Percent Additives | ||||
|---|---|---|---|---|---|---|---|
Perforation Record |
|||||||
| Shots Per Foot | Perforation Top |
Perforation Bottom |
Bridge Plug Type |
Bridge Plug Set At |
Material Record | ||
|---|---|---|---|---|---|---|---|
| 3 | 966 | 975 | |||||