|
|
|
Specific Well--15-057-20828-0003
Engineering Data |
|
|
| View General Well Data | Viewing Engineering Data |
|
API: 15-057-20828-0003
KID: 1057566739 Lease: BROBEE SWD Well: 1-26 Original operator: M3 Helium Corp Current operator: M3 Helium Corp Field: Location: T26S R24W, Sec. 26 SE SW SE SE 320 North, 730 West, from SE corner NAD27 Longitude: -99.9082385 NAD27 Latitude: 37.7507385 NAD83 Longitude: -99.90865 NAD83 Latitude: 37.75076 Lat-long from GPS |
County: Ford
Permit Date: Spud Date: Apr-01-2026 Completion Date: Apr-01-2026 Plugging Date: Well Type: SWD Status: Authorized Injection Well Total Depth: 6630 Elevation: 2544 KB Producing Formation: IP Oil (bbl): IP Water (bbl): IP GAS (MCF): KCC Permit No.: |
|
View well on interactive map
View well in the Walter's Digital Library (WDL login required) | |
|
Drill Stem Tests Taken: No Samples Set to Survey: No Cores Taken: No Electric Logs Run: No Method of Completion: Open Hole Date of First or Resumed Production/Injection: |
Producing Method: Estimated production per 24 hours Oil: Water: Gas: Disposition of Gas: Tubing record Size: 4.5 Set at: 4688 Packer at: 4688 Production intervals: 4688 ; 6630 |
Casing recordnew or used? New |
|||||||
| Purpose of String | Size Hole Drilled |
Size Casing Set (in O.D.) |
Weight Lbs/Ft |
Setting Depth |
Type of Cement |
# Sacks Used |
Type and Percent Additives |
|---|---|---|---|---|---|---|---|
| Conductor | 24 | 20 | 75 | 130 | Grou | 13 | see |
| Surface | 12 | 9.63 | 36 | 1449 | Ha | 510 | see |
| Intermediate | 8 | 7 | 26 | 5845 | H | 280 | see original complrtion |
Additional Cementing/Squeeze Recordpurpose? |
|||||||
| Depth Top Bottom |
Type of Cement | # Sacks Used | Type and Percent Additives | ||||
|---|---|---|---|---|---|---|---|
Perforation Record |
|||||||
| Shots Per Foot | Perforation Top |
Perforation Bottom |
Bridge Plug Type |
Bridge Plug Set At |
Material Record | ||
|---|---|---|---|---|---|---|---|
| 4 | 4717 | 4721 | shot | ||||
| 4 | 4735 | 4739 | shot | ||||
| 4 | 4855 | 4867 | shot | ||||