ACO-1 and Driller's Logs
PDF files from the KGS
|
Documents from the KCC
-
Intent To Drill Well
(received by KGS Oct 25, 2000)
-
Well Completion Report
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Feb 10, 2012)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Dec 14, 2012)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
-
One Point Stabilized Open Flow Deliverability Test
(received by KGS Nov 11, 2000)
|
For information on software to view and use the files we distribute
on our web pages, please view our
File Format Tools page.
|
Wireline Log Header Data
Logger: Eli Wireline Services
Tool: Gamma Ray Correlation Cement Bond Log
Operator on log Lobo Production, Inc.
Top: 450; Bottom: 1109
Log Date: Nov-18-2000
BHT: F
Gamma Ray: Y
Spontaneous Potential:
Holdings at: Lawrence
|
|
Logger: Schlumberger
Tool: Array Induction Linear Correlation
Operator on log Lobo Production, Inc.
Top: 351; Bottom: 1152
Log Date: Nov-10-2000
BHT: 65F
Gamma Ray: Y
Spontaneous Potential: Y
Holdings at: Lawrence
|
|
Logger: Schlumberger
Tool: Compensated Neutron Formation Density
Operator on log Lobo Production, Inc.
Top: 700; Bottom: 1142
Log Date: Nov-10-2000
BHT: F
Gamma Ray: Y
Spontaneous Potential:
Holdings at: Lawrence
|
|
Logger: Eli Wireline Services
Tool: Gamma Ray Correlation Temperature Log
Operator on log Lobo Production, Inc.
Top: 0; Bottom: 1109
Log Date: Nov-11-2000
BHT: F
Gamma Ray: Y
Spontaneous Potential:
Holdings at: Lawrence
|
|
For information on software to view and use the files we distribute
on our web pages, please view our
File Format Tools page.
|
Cuttings Data
Box Number: D5174
Starting Depth: 870
Ending Depth: 1120
|
Tops Data
Formation (source name) | Top | Base | Source | Updated |
Niobrara Chalk Formation
(Niobrara) |
963 |
|
Completion Report |
Nov-04-2002 |
Gas Production Data
This well has been linked to a gas lease.
Information from Outside Sources
Please note: The link below takes you away from the web site of the Kansas Geological Survey to the website of the Kansas Geological Society, a library in Wichita. The Survey can not help with information presented by the Walters Digital Library.
From Kansas Geological Society's Walters Digital Library
|