ACO-1 and Driller's Logs
Documents from the KCC
-
Intent To Drill Well
(received by KGS Aug 09, 2019)
-
Well Completion Report
(received by KGS Oct 24, 2019)
-
Drill Stem Test
(received by KGS Oct 24, 2019)
-
Cement Tickets
(received by KGS Oct 22, 2019)
-
Cement Tickets
(received by KGS Oct 24, 2019)
-
Cement Tickets
(received by KGS Oct 24, 2019)
-
Cement Tickets
(received by KGS Oct 24, 2019)
-
Operator's Plugging Report
(received by KGS Oct 22, 2019)
-
Pit Closure - Drilling Pit
(received by KGS Apr 16, 2020)
-
Plotted Geological Report/Mud Log
(received by KGS Oct 24, 2019)
-
Plugging Application
(received by KGS Oct 22, 2019)
-
Well Map
(received by KGS Aug 09, 2019)
|
For information on software to view and use the files we distribute
on our web pages, please view our
File Format Tools page.
|
Wireline Log Header Data
Logger: Halliburton
Tool: Borehole Compensated Sonic Array
Operator on log Stelbar Oil Corporation, Inc.
Top: 1508; Bottom: 5465
Log Date: Aug-25-2019
BHT: 125F
Gamma Ray: Y
Spontaneous Potential:
Log via KCC Electronic Submittal.
|
|
Logger: Halliburton
Tool: Detail Logs
Operator on log Stelbar Oil Corporation, Inc.
Top: 3950; Bottom: 5482
Log Date: Aug-25-2019
BHT: 125F
Gamma Ray: Y
Spontaneous Potential:
Log via KCC Electronic Submittal.
Original log is in color.
|
|
Logger: Halliburton
Tool: Annular Hole Volume log 5.5-inch casing
Operator on log Stelbar Oil Corporation, Inc.
Top: 1508; Bottom: 5488
Log Date: Aug-25-2019
BHT: 125F
Gamma Ray: Y
Spontaneous Potential:
Log via KCC Electronic Submittal.
|
|
Logger: Halliburton
Tool: Spectral Density Dual Spaced Neutron
Operator on log Stelbar Oil Corporation, Inc.
Top: 1508; Bottom: 5485
Log Date: Aug-25-2019
BHT: 125F
Gamma Ray: Y
Spontaneous Potential:
Log via KCC Electronic Submittal.
|
|
Logger: Halliburton
Tool: Array Compensated True Resistivity
Operator on log Stelbar Oil Corporation, Inc.
Top: 1508; Bottom: 5482
Log Date: Aug-25-2019
BHT: 125F
Gamma Ray: Y
Spontaneous Potential: Y
Log via KCC Electronic Submittal.
|
|
Logger: Halliburton
Tool: Microlog
Operator on log Stelbar Oil Corporation, Inc.
Top: 3950; Bottom: 5488
Log Date: Aug-25-2019
BHT: 125F
Gamma Ray: Y
Spontaneous Potential:
Log via KCC Electronic Submittal.
|
|
Logger: Halliburton
Tool: Quad Combo Composite Log
Operator on log Stelbar Oil Corporation, Inc.
Top: 1508; Bottom: 5488
Log Date: Aug-25-2019
BHT: 125F
Gamma Ray: Y
Spontaneous Potential: Y
Log via KCC Electronic Submittal.
|
|
For information on software to view and use the files we distribute
on our web pages, please view our
File Format Tools page.
|
Digital Wireline Log (LAS File) available
(Right click and "Save File As" to download)
Cuttings Data
Box Number: F4689
Starting Depth: 3950
Ending Depth: 4680
Skips: 4040-4060
|
Box Number: F4690
Starting Depth: 4680
Ending Depth: 5494
Skips: 5490-5494
|
Tops Data
Formation (source name) | Top | Base | Source | Updated |
Lecompton
|
4031 |
|
Geological Report |
Dec-02-2021 |
Heebner Shale
|
4168 |
|
Completion Report |
Dec-02-2021 |
Lansing
|
4280 |
|
Completion Report |
Dec-02-2021 |
Stark Shale
|
4673 |
|
Completion Report |
Dec-02-2021 |
Hushpuckney
|
4721 |
|
Geological Report |
Dec-02-2021 |
Marmaton
|
4801 |
|
Completion Report |
Dec-02-2021 |
Pawnee
|
4898 |
|
Geological Report |
Dec-02-2021 |
Cherokee Shale
|
4948 |
|
Completion Report |
Dec-02-2021 |
Morrow Shale
|
5179 |
|
Completion Report |
Dec-02-2021 |
Mississippian Chester
|
5245 |
|
Geological Report |
Dec-02-2021 |
Ste. Genevieve
|
5328 |
|
Completion Report |
Dec-02-2021 |
St. Louis
|
5374 |
|
Geological Report |
Dec-02-2021 |
Anhydrite
|
|
1834 |
Completion Report |
Dec-02-2021 |
DST Data
Information from Outside Sources
Please note: The link below takes you away from the web site of the Kansas Geological Survey to the website of the Kansas Geological Society, a library in Wichita. The Survey can not help with information presented by the Walters Digital Library.
From Kansas Geological Society's Walters Digital Library
|