County: Pratt Select location of well to view details. Click on column heading to sort. | |||
View page: < Prev || 31 || 32 || 33 || 34 || 35 || 36 || 37 || 38 || 39 || 40 || Next > | |||||||||
T-R-S | Owner | Well Depth Ascend. Desc. |
Static Water Level Ascend. Desc. |
Est. Yield Ascend. Desc. |
Well Use | Other ID | Action Taken | Completion Date Ascend. Desc. |
Scan? |
T27S, R12W, Sec. 3 SE NE NE |
Studer, Bill | 58 ft. | 19 ft. | Domestic | Constructed | 19-Mar-1992 | |||
T27S, R12W, Sec. 3 C N2 NE |
Wheatstate Drilling | 165 ft. | 50 ft. | Oil Field Water Supply | Studer 1-3 | Constructed | 29-Jan-1985 | ||
T27S, R12W, Sec. 3 C NE NE |
Wheatstate Oilfield Services | 120 ft. | 51 ft. | 80 gpm. | Oil Field Water Supply | Studer 2-3 | Constructed | 09-Apr-1985 | |
T27S, R12W, Sec. 4 SE SW NW |
Allen Drilling Co. | 155 ft. | 16 ft. | Oil Field Water Supply | Miskimen 1-4 | Constructed | 04-Oct-1991 | ||
T27S, R12W, Sec. 4 SE NE SE |
APAC-Shears | 60 ft. | 14 ft. | Other | Constructed | 09-Jun-2003 | |||
T27S, R12W, Sec. 4 SE SE SE |
Eagle Drilling/Gene Stueder | 118 ft. | 22 ft. | 60 gpm. | Oil Field Water Supply | Stueder 2 | Constructed | 12-Jan-1987 | |
T27S, R12W, Sec. 4 SW SW NE |
Fossil Drilling | 90 ft. | 32 ft. | Oil Field Water Supply | Plugged | 01-Jun-2016 | |||
T27S, R12W, Sec. 4 SW SW NE |
Fossil Drilling | 90 ft. | 32 ft. | Oil Field Water Supply | Constructed | 22-Jan-2014 | |||
T27S, R12W, Sec. 4 C S2 NE |
Hummon Corp. | 92 ft. | 10.5 ft. | Oil Field Water Supply | Miskimen 2 | Constructed | 25-Sep-1993 | ||
T27S, R12W, Sec. 4 NW NW NW |
Mark Schneider Estate | 50 ft. | 21 ft. | 60 gpm. | Domestic, Livestock | Constructed | 02-Jun-2014 | ||
T27S, R12W, Sec. 4 SE NW SW |
Sterling Drilling Co. | 110 ft. | 30 ft. | 100 gpm. | Oil Field Water Supply | Studer 6 | Constructed | 25-Jan-2023 | |
T27S, R12W, Sec. 4 NW SE SW SW |
Struder, Bill (Sterling Drilling Co.) | 95 ft. | 20 ft. | 100 gpm. | Domestic, changed from Oil Field Water Supply | Studer 5 | Constructed | 31-Mar-2022 | |
T27S, R12W, Sec. 4 C SE SW |
Studer, Bill | 80 ft. | 19 ft. | 80 gpm. | Domestic | Constructed | 11-Jul-1985 | ||
T27S, R12W, Sec. 4 C SE |
Stueder, Bill | 60 ft. | 27 ft. | 60 gpm. | Domestic | Constructed | 24-Mar-1988 | ||
T27S, R12W, Sec. 4 NW NW SW |
Withrow, Phil | 80 ft. | 27 ft. | Domestic | Constructed | 28-Mar-1983 | |||
T27S, R12W, Sec. 5 SE SE SW SE |
Fortress Farm | 50 ft. | 19 ft. | 100 gpm. | Domestic, Livestock | Constructed | 07-Jun-2022 | ||
T27S, R12W, Sec. 5 N2 NW NE |
H-30 Drilling, Inc. | 110 ft. | 33 ft. | 75 gpm. | Oil Field Water Supply | Schmitz 1 | Constructed | 18-Mar-1980 | |
T27S, R12W, Sec. 5 NW NW SW SW |
Kirby, Shawn | 110 ft. | 30 ft. | 100 gpm. | Domestic, Livestock | Constructed | 08-Jun-2022 | ||
T27S, R12W, Sec. 5 SW SW SW NW |
T&W Meat | 80 ft. | 34 ft. | Domestic, Livestock | Constructed | 11-Nov-2021 | |||
T27S, R12W, Sec. 5 NW NE SW |
Wheatstate Drilling | 120 ft. | 35 ft. | Oil Field Water Supply | Dikeman B 1-5 | Constructed | 08-Mar-1985 | ||
T27S, R12W, Sec. 5 NE SW SE |
Wheatstate Drilling/Ralph Dikeman | 100 ft. | 22 ft. | Oil Field Water Supply | Dikeman 1-5 | Constructed | 31-Mar-1984 | ||
T27S, R12W, Sec. 6 NE NE NW |
Kansas Geological Survey | 90 ft. | 31 ft. | Test hole/well | 36-4 | Constructed | 18-Jun-1982 | ||
T27S, R12W, Sec. 6 NE NE NW |
Kansas Geological Survey | 151 ft. | 21 ft. | Test hole/well | 36-3 | Constructed | 17-Jun-1982 | ||
T27S, R12W, Sec. 6 NE NE NW |
Kansas Geological Survey | 215 ft. | 33.5 ft. | Test hole/well | 36-1 | Constructed | 16-Jun-1982 | ||
T27S, R12W, Sec. 6 NE NE NW |
Kansas Geological Survey | 196 ft. | 30.3 ft. | Test hole/well | 36-2 | Constructed | 17-Jun-1982 | ||
T27S, R12W, Sec. 6 SE SE NE |
Petrowsky, Merle | 70 ft. | 31.5 ft. | 90 gpm. | Domestic | Constructed | 16-Dec-1980 | ||
T27S, R12W, Sec. 7 SE SE NE |
Armour, Dick | 80 ft. | 18 ft. | Domestic | Constructed | 12-Oct-1999 | |||
T27S, R12W, Sec. 7 NE NE SE |
Armour, Dick | 79 ft. | 18 ft. | 60 gpm. | Domestic | Constructed | 12-Oct-1999 | ||
T27S, R12W, Sec. 7 NW NE NE |
Helmke, Richard | 100 ft. | 36 ft. | 100 gpm. | Domestic | Constructed | 04-Nov-1982 | ||
T27S, R12W, Sec. 7 NE SW NW SE |
Iuka/Carmin Devlopment, LLC | 94 ft. | 19 ft. | 100 gpm. | Oil Field Water Supply | PWS 1-7 SWD | Constructed | 09-Dec-2014 |
KOLAR |
T27S, R12W, Sec. 7 W2 NW NE |
Johnson, Roy B. | 70 ft. | 14 ft. | 200 gpm. | Domestic, Livestock | Constructed | 01-Sep-1977 | ||
T27S, R12W, Sec. 7 NW NW SE |
Pratt Well Service Inc. | 46 ft. | 10 ft. | Monitoring well/observation/piezometer | Constructed | 29-Feb-2000 | |||
T27S, R12W, Sec. 7 NW SE SW |
Sterling Drilling Co./Don H. Hullman | 111 ft. | 28 ft. | 60 gpm. | Oil Field Water Supply | Luders B 6 | Constructed | 04-Aug-1997 | |
T27S, R12W, Sec. 7 NE NE NE |
Tritch, Bob | 91 ft. | Domestic | Constructed | 10-Oct-2003 | ||||
T27S, R12W, Sec. 8 SE NE NE |
Aldebaron Drilling Co. | 62 ft. | 11 ft. | 80 gpm. | Oil Field Water Supply | Dietz C 1 | Constructed | 20-Feb-1986 | |
T27S, R12W, Sec. 8 C SE NE |
Aldebaron Drilling Co. | 60 ft. | 12 ft. | 70 gpm. | Oil Field Water Supply | Grizzly 1 | Constructed | 02-Nov-1985 | |
T27S, R12W, Sec. 8 NW NW NE |
Case Oil and Gas | 90 ft. | 25 ft. | 80 gpm. | Oil Field Water Supply | Studer 1 | Constructed | 25-Sep-1985 | |
T27S, R12W, Sec. 8 NW NW SW |
Cubbage, George | 75 ft. | 27 ft. | Domestic | Constructed | 19-Jul-2005 | |||
T27S, R12W, Sec. 8 NW NW SW |
Cubbage, George | 36.25 ft. | 26 ft. | Domestic | Plugged | 18-Jul-2005 | |||
T27S, R12W, Sec. 8 SW SW SW |
Deutsch Oil Co./Don Dietz | 107 ft. | 37 ft. | Oil Field Water Supply | Dietz 1-8 | Constructed | 22-Aug-2007 | ||
T27S, R12W, Sec. 8 NE NW SW |
Dietz, Don | 110 ft. | 33 ft. | Oil Field Water Supply | Constructed | 07-Nov-1992 | |||
T27S, R12W, Sec. 8 SW NE SW |
Dietz, Don | 72 ft. | 30 ft. | Irrigation | Constructed | 14-Nov-2023 |
KOLAR |
||
T27S, R12W, Sec. 8 SE SE SW |
H-30 Drilling, Inc. | 80 ft. | 34 ft. | 80 gpm. | Oil Field Water Supply | Dietz A 1 | Constructed | 01-May-1985 | |
T27S, R12W, Sec. 8 E2 NW SE |
Hummon Corp. | 130 ft. | 34 ft. | Oil Field Water Supply | Studer 1 | Constructed | 18-Jun-1991 | ||
T27S, R12W, Sec. 8 E2 NW SE |
Hummon Corp. | 130 ft. | 34 ft. | Oil Field Water Supply | Plugged | 10-May-1993 | |||
T27S, R12W, Sec. 8 NW NW NE |
Lobo Drilling Co./Gene Studer | 133 ft. | 33 ft. | 60 gpm. | Oil Field Water Supply | Studer 1 | Constructed | 18-Mar-1985 | |
T27S, R12W, Sec. 8 SW SW NW |
Ramco Drilling Co. | 122 ft. | 30 ft. | 60 gpm. | Oil Field Water Supply | Pollock 1 | Constructed | 29-Aug-1981 | |
T27S, R12W, Sec. 8 SW NW NW |
Ramco Drilling Co. | 135 ft. | 26 ft. | 60 gpm. | Oil Field Water Supply | Pollock 2 Twin | Constructed | 05-Nov-1981 | |
T27S, R12W, Sec. 8 SW SW SE |
Studer, Leonard | 80 ft. | 55 ft. | Domestic | Constructed | 13-Aug-1975 | |||
T27S, R12W, Sec. 8 SE NE NE |
W.K. Black, Inc./Donald Dietz | 62 ft. | 11 ft. | Oil Field Water Supply | Dietz C 1 | Plugged | 11-May-1986 | ||
View page: < Prev || 31 || 32 || 33 || 34 || 35 || 36 || 37 || 38 || 39 || 40 || Next > |