|
|
|
County: Pratt Select location of well to view details. Click on column heading to sort. |
|
|
|
| View page: < Prev || 81 || 82 || 83 || 84 || 85 || 86 || 87 || 88 || 89 || 90 || Next > | |||||||||
| T-R-S | Owner | Well Depth Ascend. Desc. |
Static Water Level Ascend. Desc. |
Est. Yield Ascend. Desc. |
Well Use | Other ID | Action Taken | Completion Date Ascend. Desc. |
Scan? |
|
T28S, R15W, Sec. 22 NE NW NW |
Winklepleck, Roy | 162 ft. | 58 ft. | Domestic | Constructed | 31-Oct-2008 | |||
|
T28S, R15W, Sec. 23 C SW NW |
Red Tiger Drilling Co. | 140 ft. | 100 ft. | 60 gpm. | Oil Field Water Supply | Miller 1-23 | Constructed | 11-Dec-1981 | |
|
T28S, R15W, Sec. 24 NE NE NE |
Borho and Pfeifer Farms | 138 ft. | 118 ft. | Domestic | Plugged | 06-Dec-2002 | |||
|
T28S, R15W, Sec. 24 NE NE NE |
Borho and Pfeifer Farms | 138 ft. | 118 ft. | Domestic | Constructed | 06-Dec-2002 | |||
|
T28S, R15W, Sec. 24 C E2 NW |
Brehm, Robert | 213 ft. | 91 ft. | Monitoring well/observation/piezometer | Constructed | 24-Jan-1997 | |||
|
T28S, R15W, Sec. 24 C E2 NW |
Brehm, Robert G. | 207 ft. | 115 ft. | Irrigation | Constructed | 09-Jun-1997 | |||
|
T28S, R15W, Sec. 24 E2 NE SE |
Cowen, Eric | 160 ft. | 89 ft. | 80 gpm. | Oil Field Water Supply | Cowen 1 | Plugged | 29-Jan-1986 | |
|
T28S, R15W, Sec. 24 NE NE NE |
Eubank, Paul | 160 ft. | 100 ft. | Domestic, Livestock | Constructed | 26-May-1998 | |||
|
T28S, R15W, Sec. 24 NE NE NE |
Eubank, Paul | 196 ft. | 72 ft. | 1200 gpm. | Irrigation | Constructed | 12-Jun-1998 | ||
|
T28S, R15W, Sec. 24 E2 NE SE |
H-30 Drilling, Inc. | 160 ft. | 89 ft. | 80 gpm. | Oil Field Water Supply | Cowen 1 | Constructed | 20-Jan-1986 | |
|
T28S, R15W, Sec. 24 C S2 NE |
Red Tiger Drilling Co. | 182 ft. | 110 ft. | 60 gpm. | Oil Field Water Supply | Berry 1-24 | Constructed | 03-Nov-1980 | |
|
T28S, R15W, Sec. 25 NW NE SW |
Briggeman, Stuart | 278 ft. | 116.15 ft. | Monitoring well/observation/piezometer | OB 1-97 | Constructed | 25-Sep-1997 | ||
|
T28S, R15W, Sec. 25 N2 SW |
Briggeman, Stuart | 229 ft. | 115 ft. | Irrigation | Constructed | 13-Apr-1998 | |||
|
T28S, R15W, Sec. 25 NE NE NE |
Guttridge, Joe | 155 ft. | 97 ft. | 100 gpm. | Domestic | Constructed | 17-Jun-1983 | ||
|
T28S, R15W, Sec. 25 C NE SE |
H-30 Drilling Inc./Edith Johnson | 180 ft. | 60 gpm. | Oil Field Water Supply | Johnson A 1 | Constructed | 03-Apr-1986 | ||
|
T28S, R15W, Sec. 25 C SE NE |
H-30 Drilling Inc./Joe Guttridge | 170 ft. | 100 ft. | 60 gpm. | Oil Field Water Supply | Guttridge A 1 | Constructed | 30-Aug-1986 | |
|
T28S, R15W, Sec. 25 C NE SE |
Johnson, Edith | 180 ft. | 60 gpm. | Oil Field Water Supply | Johnson A 1 | Plugged | 01-Apr-1986 | ||
|
T28S, R15W, Sec. 25 C NE SW |
Red Tiger Drilling Co. | 170 ft. | 100 ft. | 65 gpm. | Oil Field Water Supply | Cook H 1 | Constructed | 19-Mar-1980 | |
|
T28S, R15W, Sec. 25 SE SE SE |
Van Eaton Ready Mix, Inc | 215 ft. | 110 ft. | Industrial | Constructed | 18-May-2018 | |||
|
T28S, R15W, Sec. 27 C NW NW |
Cono Lawhon Faln Trust/Thomas Frazier, Trustee | 110 ft. | Domestic | Constructed | 16-Sep-2002 | ||||
|
T28S, R15W, Sec. 28 SE NW NW |
Ainsworth Drilling Co. | 180 ft. | 95 ft. | Oil Field Water Supply | Poovey 2 | Plugged | 24-Oct-1985 | ||
|
T28S, R15W, Sec. 28 SE NW NW |
Allen Drilling/Neal Poovey | 180 ft. | 95 ft. | Oil Field Water Supply | Poovey 2 | Constructed | 12-Sep-1983 | ||
|
T28S, R15W, Sec. 28 NW NW NW |
Red Tiger Drilling/Mrs. Neal Poovey | 185 ft. | 90 ft. | Oil Field Water Supply | Poovey 1 | Plugged | 11-Jun-1983 | ||
|
T28S, R15W, Sec. 28 NW NW NW |
Red Tiger Drilling/Rick Poovey | 185 ft. | 90 ft. | 60 gpm. | Oil Field Water Supply | Poovey 1 | Constructed | 26-May-1983 | |
|
T28S, R15W, Sec. 29 NE NE NE |
D. R. Lauck Oil Co. | 130 ft. | 82 ft. | Oil Field Water Supply | WBT Farms 1 | Constructed | 19-Feb-1982 | ||
|
T28S, R15W, Sec. 29 NW NW NE |
Sessions Farms Inc | 120 ft. | Domestic | Constructed | 23-May-2008 | ||||
|
T28S, R15W, Sec. 29 C NW SE |
Thompson, Dwight H. | 159 ft. | 71 ft. | Oil Field Water Supply | Thompson W 1 | Constructed | 12-Dec-1985 | ||
|
T28S, R15W, Sec. 30 NW NW NW |
Abercrombie Drilling/Loyd Smith | 182 ft. | 110 ft. | 95 gpm. | Oil Field Water Supply | Smith 1 | Constructed | 19-Jun-1989 | |
|
T28S, R15W, Sec. 30 C NW NW |
Aldebaron Drilling Co./Mr. Smith | 180 ft. | 120 ft. | Oil Field Water Supply | Smith 1 | Constructed | 03-Jul-1985 | ||
|
T28S, R15W, Sec. 30 NW SE SE SE |
Smith, Allen | 160 ft. | 87 ft. | 30 gpm. | Domestic, Livestock | Constructed | 15-Jul-2020 |
KOLAR |
|
|
T28S, R15W, Sec. 31 C SW SW |
Red Tiger Drilling Co. | 155 ft. | 92 ft. | 60 gpm. | Oil Field Water Supply | Whitney 1-31 | Constructed | 15-Oct-1979 | |
|
T28S, R15W, Sec. 31 C SE |
Smith, A.A. | 213 ft. | 83 ft. | 1400 gpm. | Irrigation | Constructed | 26-Apr-1977 | ||
|
T28S, R15W, Sec. 31 SE SE SE |
Smith, Morris | 152 ft. | 52 ft. | 75 gpm. | Domestic, Livestock | Constructed | 26-Nov-2024 |
KOLAR |
|
|
T28S, R15W, Sec. 31 W2 SW SW |
White and Ellis Drilling Inc. | Oil Field Water Supply | Whitney A 1 | Plugged | 17-May-1984 | ||||
|
T28S, R15W, Sec. 31 W2 SW SW |
White and Ellis Drilling/James Whitney | 180 ft. | 115 ft. | 60 gpm. | Oil Field Water Supply | Whitney A 1 | Constructed | 08-May-1984 | |
|
T28S, R15W, Sec. 31 C SW |
Whitney, Duward | 203 ft. | 95 ft. | 1000 gpm. | Irrigation | Constructed | 19-Feb-1976 | ||
|
T28S, R15W, Sec. 32 NW SW NW |
Johnson, Broyce | 120 ft. | 72 ft. | Domestic, Livestock | Constructed | 11-Sep-1975 | |||
|
T28S, R15W, Sec. 32 C S2 SE |
Vincent Oil Corp. | 114 ft. | 37 ft. | Oil Field Water Supply | Johnson 1-32 | Constructed | 26-May-2003 | ||
|
T28S, R15W, Sec. 33 C SW SE |
Aldebaron Drilling Co./J.C. Moore | 150 ft. | 65 ft. | Oil Field Water Supply | Moore 1 | Constructed | 19-May-1985 | ||
|
T28S, R15W, Sec. 33 C NW |
Smith, Lloyd | 181 ft. | 57 ft. | 1000 gpm. | Irrigation | Constructed | 16-Dec-1976 | ||
|
T28S, R15W, Sec. 34 SE NE NW |
Aldebaron Drilling Co. | 140 ft. | 92 ft. | 80 gpm. | Oil Field Water Supply | Moore 2 | Constructed | 09-Aug-1985 | |
|
T28S, R15W, Sec. 35 SE SE SE |
Aldebaron Drilling Co. | 140 ft. | 97 ft. | 100 gpm. | Oil Field Water Supply | Bryan 1 | Constructed | 24-Oct-1985 | |
|
T28S, R15W, Sec. 36 NW NE NW |
Pickrell Drilling/Edith Johnson | 180 ft. | 105 ft. | Oil Field Water Supply | Johnson 1 FF | Constructed | 28-May-1983 | ||
|
T29S, R11W, Sec. 1 NW NW NW |
Blasi, Mary | 90 ft. | 36 ft. | 80 gpm. | Domestic, Livestock | Constructed | 17-Jul-1985 | ||
|
T29S, R11W, Sec. 1 NE NE SE |
KGS/GMD 5 | 155 ft. | 46.9 ft. | Monitoring well/observation/piezometer | 45-2 | Constructed | 10-Sep-1982 | ||
|
T29S, R11W, Sec. 1 NE NE SE |
KGS/GMD 5 | 90 ft. | 46.1 ft. | Monitoring well/observation/piezometer | 45-3 | Constructed | 25-Mar-1983 | ||
|
T29S, R11W, Sec. 1 NE NE SE |
KGS/GMD 5 | 197 ft. | 46.9 ft. | Monitoring well/observation/piezometer | 45-1 | Constructed | 02-Sep-1982 | ||
|
T29S, R11W, Sec. 1 NE NE SE |
Krug, Ralph | 95 ft. | 52 ft. | Domestic | Constructed | 15-Feb-2008 | |||
|
T29S, R11W, Sec. 1 C NW SW |
Schnittker, John | 100 ft. | 53 ft. | Oil Field Water Supply | Schnitker 1 | Constructed | 22-Aug-1990 | ||
|
T29S, R11W, Sec. 1 SE NE NE |
Search Drilling Co. | 90 ft. | 55 ft. | Oil Field Water Supply | Krug 1 | Constructed | 19-Dec-1978 | ||
| View page: < Prev || 81 || 82 || 83 || 84 || 85 || 86 || 87 || 88 || 89 || 90 || Next > | |||||||||