![]() |
![]() |
County: Kingman Select location of well to view details. Click on column heading to sort. |
![]() |
![]() |
View page: < Prev || 11 || 12 || 13 || 14 || 15 || 16 || 17 || 18 || 19 || 20 || Next > | |||||||||
T-R-S | Owner | Well Depth Ascend. Desc. |
Static Water Level Ascend. Desc. |
Est. Yield Ascend. Desc. |
Well Use | Other ID | Action Taken | Completion Date Ascend. Desc. |
Scan? |
T27S, R9W, Sec. 3 C SW SW |
Brandt Drilling Co. | 110 ft. | 34 ft. | 100 gpm. | Oil Field Water Supply | Constructed | 07-Apr-1981 | ||
T27S, R9W, Sec. 3 NE SE NE |
Harmon, Jim | 65 ft. | 19 ft. | Domestic | Constructed | 26-Jan-1981 | |||
T27S, R9W, Sec. 3 NE NW NE |
Woodson, Joe | 116 ft. | 23 ft. | 1250 gpm. | Irrigation | Constructed | 10-Nov-1978 | ||
T27S, R9W, Sec. 4 C SE SW |
Abercrombie Drilling, Inc. | 105 ft. | 40 ft. | 50 gpm. | Oil Field Water Supply | Constructed | 04-Aug-1977 | ||
T27S, R9W, Sec. 4 SW NW NW |
D and T Farms | 82 ft. | 34 ft. | 15 gpm. | Domestic | Constructed | 30-Dec-2004 | ||
T27S, R9W, Sec. 4 NE NE |
DaMac Drilling Inc. | 165 ft. | 46 ft. | 40 gpm. | Oil Field Water Supply | Constructed | 13-Jul-1976 | ||
T27S, R9W, Sec. 4 E2 NW |
Oak, Melvin | 95 ft. | 80 ft. | Domestic | Constructed | 15-Aug-1976 | |||
T27S, R9W, Sec. 5 NE NE SW NW |
Foster Farms | 148 ft. | 47.7 ft. | Irrigation | Constructed | 09-Jan-2018 | |||
T27S, R9W, Sec. 5 SE SE NE |
Foster, Terry | 92 ft. | 35 ft. | 10 gpm. | Domestic | Constructed | 12-Jan-2003 | Scan | |
T27S, R9W, Sec. 5 NE SE NE |
J.W. Drilling Co., Inc. | 90 ft. | 32 ft. | Oil Field Water Supply | Schumacher 2 | Plugged | 05-Sep-1984 | ||
T27S, R9W, Sec. 5 C SW NW |
Pickrell Drilling Co. | 120 ft. | 49 ft. | 300 gpm. | Industrial | Constructed | 06-Apr-1976 | ||
T27S, R9W, Sec. 5 C NW |
Pickrell Drilling Co. | 120 ft. | 49 ft. | 300 gpm. | Oil Field Water Supply | Constructed | 06-Apr-1976 | ||
T27S, R9W, Sec. 5 C NE NE |
Red Tiger Drilling Co. | 107 ft. | 34 ft. | 65 gpm. | Oil Field Water Supply | Constructed | 10-May-1978 | ||
T27S, R9W, Sec. 5 NE SE NE |
Schumacher/J.W. Drilling Co, Inc. | 90 ft. | 32 ft. | Oil Field Water Supply | Schumacher 2 | Constructed | 02-Jul-1983 | ||
T27S, R9W, Sec. 5 C NW |
Stillwell, Lee | 147 ft. | 43 ft. | Irrigation | Constructed | 17-Apr-1985 | |||
T27S, R9W, Sec. 6 C NW NW |
Bradshaw, Vleda | 164 ft. | 45 ft. | 1500 gpm. | Irrigation | Constructed | 07-Apr-1978 | ||
T27S, R9W, Sec. 6 SW NE SW |
Helm Farm's Inc. | 150 ft. | 39.5 ft. | Irrigation | Constructed | 01-Sep-1987 | |||
T27S, R9W, Sec. 7 NW NW SE |
Big Springs Drilling | 145 ft. | 70 ft. | Oil Field Water Supply | Bradshaw 2 A | Plugged | 01-Sep-1981 | ||
T27S, R9W, Sec. 7 NW NW SE |
Big Springs Drilling | 145 ft. | 70 ft. | 60 gpm. | Oil Field Water Supply | Constructed | 14-Sep-1981 | ||
T27S, R9W, Sec. 7 SW NW SE |
Cederford Interprises | 112 ft. | 63 ft. | Oil Field Water Supply | Constructed | 18-Jun-1993 | |||
T27S, R9W, Sec. 7 SW NE NW |
D. R. Lauck Oil Co. | 120 ft. | 45 ft. | Oil Field Water Supply | Amerine 2 | Constructed | 30-Jan-1980 | ||
T27S, R9W, Sec. 7 SW SE NW |
D. R. Lauck Oil Co. | 100 ft. | 62 ft. | Oil Field Water Supply | Amerine 3 | Constructed | 09-Sep-1980 | ||
T27S, R9W, Sec. 7 SW NE NW |
Lee Phillips Oil Co. | 120 ft. | 45 ft. | Oil Field Water Supply | Amerine 2 | Plugged | 26-Jun-1984 | ||
T27S, R9W, Sec. 7 SW SE NW |
Lee Phillips Oil Co. | 100 ft. | 62 ft. | Oil Field Water Supply | Amerine 3 | Plugged | 30-Jul-1984 | ||
T27S, R9W, Sec. 8 NW NW NW |
Bradshaw, Loren | 140 ft. | 53 ft. | Air Conditioning | Constructed | 20-Sep-1978 | |||
T27S, R9W, Sec. 8 NW NW NW |
Bradshaw, Loren | 132 ft. | 13 ft. | Air Conditioning | Constructed | 27-Sep-1978 | |||
T27S, R9W, Sec. 8 NW NE NE |
Burling, Marvin L. | 50 ft. | 12.5 ft. | Domestic | Plugged | 01-Jun-1994 | |||
T27S, R9W, Sec. 8 NE NE |
Burling, Marvin L. | 55 ft. | 18 ft. | Domestic | Plugged | 01-Mar-1997 | |||
T27S, R9W, Sec. 8 SE NE NE |
Cairo Coop Equity Exchange | 93 ft. | 57 ft. | Environmental Remediation, Recovery | Constructed | 18-Jun-2008 | |||
T27S, R9W, Sec. 8 SE NE NE |
Cairo Coop Equity Exchange | 66.05 ft. | 57.14 ft. | Monitoring well/observation/piezometer | MW 12 | Constructed | 03-May-2001 | Scan | |
T27S, R9W, Sec. 8 SE NE NE |
Cairo Coop Equity Exchange | 69 ft. | 49.6 ft. | Monitoring well/observation/piezometer | MW 18 | Constructed | 11-Dec-2008 | ||
T27S, R9W, Sec. 8 SE NE NE |
Cairo Coop Equity Exchange | 70 ft. | 55.32 ft. | Monitoring well/observation/piezometer | MW 14 | Constructed | 03-Mar-2005 | ||
T27S, R9W, Sec. 8 SE NE NE |
Cairo Coop Equity Exchange | 72 ft. | 56.95 ft. | Environmental Remediation, Recovery | Constructed | 17-Dec-2005 | |||
T27S, R9W, Sec. 8 SE NE NE |
Cairo Coop Equity Exchange | 60 ft. | 54 ft. | Monitoring well/observation/piezometer | MW 13 | Constructed | 16-Dec-2004 | ||
T27S, R9W, Sec. 8 SE NE NE |
Cairo Coop Equity Exchange | 69 ft. | 53.9 ft. | Monitoring well/observation/piezometer | MW 17 | Constructed | 11-Dec-2008 | ||
T27S, R9W, Sec. 8 SE NE NE |
Cairo Coop Equity Exchange | 69 ft. | 58.1 ft. | Monitoring well/observation/piezometer | MW 4 | Constructed | 19-Jan-1999 | Scan | |
T27S, R9W, Sec. 8 SE NE NE |
Cairo Coop Equity Exchange | 75 ft. | 57 ft. | Monitoring well/observation/piezometer | MW 14 | Constructed | 15-Dec-2004 | ||
T27S, R9W, Sec. 8 SE NE NE |
Cairo Cooperative Equity Exchange | 66.5 ft. | Monitoring well/observation/piezometer | MW 4 | Plugged | 16-Dec-2024 |
KOLAR |
||
T27S, R9W, Sec. 8 SE NE NE |
Cairo Cooperative Equity Exchange | 69.53 ft. | Monitoring well/observation/piezometer | MW 12 | Plugged | 16-Dec-2024 |
KOLAR |
||
T27S, R9W, Sec. 8 NW NW NW |
Farmwalt, Alvin | 150 ft. | 59 ft. | 20 gpm. | Domestic | Constructed | 16-Feb-1980 | ||
T27S, R9W, Sec. 8 NE NE |
Penalosa Cooperative Exchange | 92 ft. | 58 ft. | Monitoring well/observation/piezometer | MW 1 | Constructed | 20-Aug-1990 | ||
T27S, R9W, Sec. 8 SE NE NE |
Skyland Grain | 73 ft. | 63 ft. | Monitoring well/observation/piezometer | Plugged | 13-Oct-2017 | |||
T27S, R9W, Sec. 8 NE NE NE |
Skyland Grain LLC | 134 ft. | 66 ft. | Environmental Remediation, Recovery | EW 3 | Constructed | 21-Sep-2017 | ||
T27S, R9W, Sec. 8 NW NE NE |
Webster, Rosemary | 138 ft. | 61 ft. | 105 gpm. | Domestic | Constructed | 12-Aug-2024 |
KOLAR |
|
T27S, R9W, Sec. 9 SW NW NW |
Cairo Coop Equity Exchange | 74.33 ft. | 59.13 ft. | Monitoring well/observation/piezometer | AS 1 | Constructed | 01-May-2001 | Scan | |
T27S, R9W, Sec. 9 SW NW NW |
Cairo Coop Equity Exchange | 67.76 ft. | 49.16 ft. | Monitoring well/observation/piezometer | MW 11 | Constructed | 03-May-2001 | Scan | |
T27S, R9W, Sec. 9 SW NW NW |
Cairo Coop Equity Exchange | 73 ft. | Environmental Remediation, Air Sparge | AS 3 | Constructed | 23-Jul-2003 | Scan | ||
T27S, R9W, Sec. 9 SW NW NW |
Cairo Coop Equity Exchange | 70 ft. | 57.85 ft. | Monitoring well/observation/piezometer | MW 13 | Constructed | 03-Mar-2005 | ||
T27S, R9W, Sec. 9 SW NW NW |
Cairo Coop Equity Exchange | 55 ft. | Environmental Remediation, Soil Vapor Extraction | SVE 4 | Constructed | 22-Jul-2003 | Scan | ||
T27S, R9W, Sec. 9 SE NW NW |
Cairo Coop Equity Exchange | 65 ft. | 57 ft. | Monitoring well/observation/piezometer | MW 15 | Constructed | 15-Dec-2004 | ||
View page: < Prev || 11 || 12 || 13 || 14 || 15 || 16 || 17 || 18 || 19 || 20 || Next > |