KGS Home Page Water Well Data base County: Kingman
Select location of well to view details.
Click on column heading to sort.
Save To File
Water Resources

3603 records. Only 50 records displayed at a time--sort will affect ALL records.
View page: < Prev || 11 || 12 || 13 || 14 || 15 || 16 || 17 || 18 || 19 || 20 || Next >
T-R-S Owner Well Depth
Ascend. Desc.
Static Water Level
Ascend. Desc.
Est. Yield
Ascend. Desc.
Well Use Other ID Action Taken Completion Date
Ascend. Desc.
Scan?
T27S, R9W, Sec. 7
NW NW SE
Big Springs Drilling 145 ft. 70 ft.   Oil Field Water Supply Bradshaw 2 A Plugged 01-Sep-1981 PDF
T27S, R9W, Sec. 7
SW NW SE
Cederford Interprises 112 ft. 63 ft.   Oil Field Water Supply   Constructed 18-Jun-1993 PDF
T27S, R9W, Sec. 7
SW SE NW
D. R. Lauck Oil Co. 100 ft. 62 ft.   Oil Field Water Supply Amerine 3 Constructed 09-Sep-1980 PDF
T27S, R9W, Sec. 7
SW NE NW
D. R. Lauck Oil Co. 120 ft. 45 ft.   Oil Field Water Supply Amerine 2 Constructed 30-Jan-1980 PDF
T27S, R9W, Sec. 7
SW NE NW
Lee Phillips Oil Co. 120 ft. 45 ft.   Oil Field Water Supply Amerine 2 Plugged 26-Jun-1984 PDF
T27S, R9W, Sec. 7
SW SE NW
Lee Phillips Oil Co. 100 ft. 62 ft.   Oil Field Water Supply Amerine 3 Plugged 30-Jul-1984 PDF
T27S, R9W, Sec. 8
NW NW NW
Bradshaw, Loren 132 ft. 13 ft.   Air Conditioning   Constructed 27-Sep-1978 PDF
T27S, R9W, Sec. 8
NW NW NW
Bradshaw, Loren 140 ft. 53 ft.   Air Conditioning   Constructed 20-Sep-1978 PDF
T27S, R9W, Sec. 8
NE NE
Burling, Marvin L. 55 ft. 18 ft.   Domestic   Plugged 01-Mar-1997 PDF
T27S, R9W, Sec. 8
NW NE NE
Burling, Marvin L. 50 ft. 12.5 ft.   Domestic   Plugged 01-Jun-1994 PDF
T27S, R9W, Sec. 8
SE NE NE
Cairo Coop Equity Exchange 69 ft. 49.6 ft.   Monitoring well/observation/piezometer MW 18 Constructed 11-Dec-2008 PDF
T27S, R9W, Sec. 8
SE NE NE
Cairo Coop Equity Exchange 69 ft. 58.1 ft.   Monitoring well/observation/piezometer MW 4 Constructed 19-Jan-1999 Scan
T27S, R9W, Sec. 8
SE NE NE
Cairo Coop Equity Exchange 70 ft. 55.32 ft.   Monitoring well/observation/piezometer MW 14 Constructed 03-Mar-2005 PDF
T27S, R9W, Sec. 8
SE NE NE
Cairo Coop Equity Exchange 66.05 ft. 57.14 ft.   Monitoring well/observation/piezometer MW 12 Constructed 03-May-2001 Scan
T27S, R9W, Sec. 8
SE NE NE
Cairo Coop Equity Exchange 69 ft. 53.9 ft.   Monitoring well/observation/piezometer MW 17 Constructed 11-Dec-2008 PDF
T27S, R9W, Sec. 8
SE NE NE
Cairo Coop Equity Exchange 72 ft. 56.95 ft.   Environmental Remediation, Recovery   Constructed 17-Dec-2005 PDF
T27S, R9W, Sec. 8
SE NE NE
Cairo Coop Equity Exchange 75 ft. 57 ft.   Monitoring well/observation/piezometer MW 14 Constructed 15-Dec-2004 PDF
T27S, R9W, Sec. 8
SE NE NE
Cairo Coop Equity Exchange 60 ft. 54 ft.   Monitoring well/observation/piezometer MW 13 Constructed 16-Dec-2004 PDF
T27S, R9W, Sec. 8
SE NE NE
Cairo Coop Equity Exchange 93 ft. 57 ft.   Environmental Remediation, Recovery   Constructed 18-Jun-2008 PDF
T27S, R9W, Sec. 8
NW NW NW
Farmwalt, Alvin 150 ft. 59 ft. 20 gpm. Domestic   Constructed 16-Feb-1980 PDF
T27S, R9W, Sec. 8
NE NE
Penalosa Cooperative Exchange 92 ft. 58 ft.   Monitoring well/observation/piezometer MW 1 Constructed 20-Aug-1990 PDF
T27S, R9W, Sec. 8
SE NE NE
Skyland Grain 73 ft. 63 ft.   Monitoring well/observation/piezometer   Plugged 13-Oct-2017 PDF
T27S, R9W, Sec. 8
NE NE NE
Skyland Grain LLC 134 ft. 66 ft.   Environmental Remediation, Recovery EW 3 Constructed 21-Sep-2017 PDF
T27S, R9W, Sec. 8
NW NE NE
Webster, Rosemary 138 ft. 61 ft. 105 gpm. Domestic   Constructed 12-Aug-2024 KOLAR
PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 70 ft. 53.5 ft.   Monitoring well/observation/piezometer MW 16 Constructed 11-Dec-2008 PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 54.3 ft.     Environmental Remediation, Soil Vapor Extraction SV 4 Plugged 15-Jun-2023 PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 70 ft. 58.41 ft.   Monitoring well/observation/piezometer MW 2 Constructed 20-Jan-1999 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 74 ft. 57.57 ft.   Monitoring well/observation/piezometer MW 1 Constructed 15-Jan-1999 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 66.55 ft. 54.83 ft.   Monitoring well/observation/piezometer OB 2 Constructed 08-May-2001 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 57.11 ft. 48.94 ft.   Monitoring well/observation/piezometer SVE 1 Constructed 01-May-2001 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 68.85 ft. 56.68 ft.   Monitoring well/observation/piezometer OB 1 Constructed 07-May-2001 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 55 ft.     Environmental Remediation, Soil Vapor Extraction SVE 4 Constructed 22-Jul-2003 Scan
T27S, R9W, Sec. 9
SE NW NW
Cairo Coop Equity Exchange 65 ft. 57 ft.   Monitoring well/observation/piezometer MW 15 Constructed 15-Dec-2004 PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 73 ft.     Environmental Remediation, Air Sparge AS 3 Plugged 15-Jun-2023 PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 75 ft.     Environmental Remediation, Air Sparge AS 2 Plugged 15-Jun-2023 PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 70 ft. 52.57 ft.   Monitoring well/observation/piezometer MW 6 Constructed 20-Jan-1999 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 70 ft. 49.23 ft.   Monitoring well/observation/piezometer MW 3 Constructed 19-Jan-1999 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 69 ft. 51.74 ft.   Monitoring well/observation/piezometer MW 8 Constructed 21-Jan-1999 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 69.56 ft. 54.98 ft.   Monitoring well/observation/piezometer MW 10 Constructed 09-May-2001 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 70 ft. 50.64 ft.   Monitoring well/observation/piezometer MW 5 Constructed 21-Jan-1999 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 70 ft. 51.06 ft.   Monitoring well/observation/piezometer MW 7 Constructed 21-Jan-1999 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 69.69 ft. 58.18 ft.   Monitoring well/observation/piezometer MW 9 Constructed 09-May-2001 Scan
T27S, R9W, Sec. 9
SW SW NW
Cairo Coop Equity Exchange 92 ft. 64 ft.   Monitoring well/observation/piezometer MW D Plugged 16-Mar-2015 PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 20 ft.     Environmental Remediation, Soil Vapor Extraction SV 3 Plugged 15-Jun-2023 PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 74.33 ft. 59.13 ft.   Monitoring well/observation/piezometer AS 1 Constructed 01-May-2001 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 67.76 ft. 49.16 ft.   Monitoring well/observation/piezometer MW 11 Constructed 03-May-2001 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 73 ft.     Environmental Remediation, Air Sparge AS 3 Constructed 23-Jul-2003 Scan
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 70 ft. 57.85 ft.   Monitoring well/observation/piezometer MW 13 Constructed 03-Mar-2005 PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 17.1 ft.     Environmental Remediation, Soil Vapor Extraction SV 2 Plugged 15-Jun-2023 PDF
T27S, R9W, Sec. 9
SW NW NW
Cairo Coop Equity Exchange 74.8 ft.     Environmental Remediation, Air Sparge AS 1 Plugged 15-Jun-2023 PDF
View page: < Prev || 11 || 12 || 13 || 14 || 15 || 16 || 17 || 18 || 19 || 20 || Next >

Kansas Geological Survey
Comments to webadmin@kgs.ku.edu
URL=http://www.kgs.ku.edu/Magellan/WaterWell/index.html
Display Programs Updated July 2, 2014
Data added continuously.