KGS Home Page Water Well Data base County: Kiowa
Select location of well to view details.
Click on column heading to sort.
Save To File
Water Resources

2637 records. Only 50 records displayed at a time--sort will affect ALL records.
View page: 1 || 2 || 3 || 4 || 5 || 6 || 7 || 8 || 9 || 10 || Next >
T-R-S Owner Well Depth
Ascend. Desc.
Static Water Level
Ascend. Desc.
Est. Yield
Ascend. Desc.
Well Use Other ID Action Taken Completion Date
Ascend. Desc.
Scan?
T27S, R16W, Sec. 12
C SE NE
Beren Co. 80 ft. 36 ft. 80 gpm. Oil Field Water Supply Kelpon 3 Constructed 21-Jul-1982 PDF
T27S, R16W, Sec. 12
C NE SW
Beren Co. 70 ft. 30 ft. 100 gpm. Oil Field Water Supply Kelton 2 Constructed 20-Apr-1982 PDF
T27S, R16W, Sec. 12
C NW
Corbet, Buster 145 ft. 15 ft. 1400 gpm. Irrigation   Constructed 04-Dec-1975 PDF
T27S, R16W, Sec. 12
NW NW NW SE
Fruit, Frank 80 ft. 19 ft.   Domestic, Livestock   Constructed 10-Jul-1975 PDF
T27S, R16W, Sec. 12
C NE SW
Kelton, J. 90 ft.   50 gpm. Oil Field Water Supply Kelton A 2 Constructed 16-Apr-1982 PDF
T27S, R16W, Sec. 12
C SW SE
Red Tiger Drilling Co. 100 ft. 33 ft. 60 gpm. Oil Field Water Supply   Constructed 27-Nov-1981 PDF
T27S, R16W, Sec. 12
C SE SE
Red Tiger Drilling Co. 100 ft. 30 ft. 60 gpm. Oil Field Water Supply   Constructed 31-Jul-1981 PDF
T27S, R16W, Sec. 12
NE
Schultz, Kevin 139 ft. 33 ft.   Irrigation   Plugged 09-Jun-2009 PDF
T27S, R16W, Sec. 12
NE
Scultz, Kevin 144 ft. 34 ft. 1321 gpm. Irrigation   Constructed 16-Jun-2009 PDF
T27S, R16W, Sec. 12
C SE SW
Sterling Drilling Co. 85 ft. 35 ft.   Oil Field Water Supply Kelten A 1 Constructed 09-Oct-1981 PDF
T27S, R16W, Sec. 12
C NE NW
Sterling Drilling Co. 90 ft. 28 ft.   Oil Field Water Supply Kelton 1 Constructed 19-Nov-1980 PDF
T27S, R16W, Sec. 12
C NE SE
White and Ellis Drilling, Inc. 80 ft. 35 ft. 60 gpm. Oil Field Water Supply   Constructed 16-Jan-1982 PDF
T27S, R16W, Sec. 12
NW SW SE
Winklepleck, Leroy 82 ft. 37 ft.   Domestic   Constructed 23-Nov-1990 PDF
T27S, R16W, Sec. 12
C NW SE
Winklepleck, Leroy 96 ft. 30 ft. 60 gpm. Oil Field Water Supply   Constructed 13-May-1982 PDF
T27S, R16W, Sec. 12
SE
Winklepleck, Leroy 157 ft. 27 ft. 1100 gpm. Irrigation   Constructed 15-Dec-1980 PDF
T27S, R16W, Sec. 13
C NW NE
Imperial Oil Co. 95 ft. 30 ft. 100 gpm. Oil Field Water Supply Hoff 3013 Constructed 10-Sep-1981 PDF
T27S, R16W, Sec. 13
C NE NW
Red Tiger Drilling Co. 95 ft. 30 ft. 60 gpm. Oil Field Water Supply   Constructed 24-Sep-1981 PDF
T27S, R16W, Sec. 13
C SW SW
Red Tiger Drilling Co. 143 ft. 41 ft. 60 gpm. Oil Field Water Supply   Constructed 10-Mar-1981 PDF
T27S, R16W, Sec. 13
C SW SE
Red Tiger Drilling Co. 100 ft. 33 ft. 60 gpm. Oil Field Water Supply   Constructed 28-Apr-1981 PDF
T27S, R16W, Sec. 13
C NE SE
Red Tiger Drilling Co. 114 ft. 48 ft. 60 gpm. Oil Field Water Supply   Constructed 01-Jun-1981 PDF
T27S, R16W, Sec. 13
C SE NW
Red Tiger Drilling Co. 115 ft. 35 ft. 60 gpm. Oil Field Water Supply   Constructed 08-Jan-1982 PDF
T27S, R16W, Sec. 13
NW SE SE
Rose, Ray 108 ft. 26.5 ft. 1500 gpm. Irrigation   Constructed 31-Jul-1980 PDF
T27S, R16W, Sec. 13
NW SE NW
Rose, Ray 142 ft. 26 ft. 1800 gpm. Irrigation   Constructed 31-Jul-1980 PDF
T27S, R16W, Sec. 13
C NE NE
White and Ellis Drilling, Inc. 100 ft. 30 ft. 60 gpm. Oil Field Water Supply   Constructed 15-Jul-1981 PDF
T27S, R16W, Sec. 13
C SE SW
White and Ellis Drilling, Inc. 98 ft. 40 ft. 60 gpm. Oil Field Water Supply   Constructed 08-Jun-1981 PDF
T27S, R16W, Sec. 13
C SE NE
White and Ellis Drilling, Inc. 120 ft. 29 ft. 60 gpm. Oil Field Water Supply   Constructed 30-Jun-1981 PDF
T27S, R16W, Sec. 13
SE SE SE
White and Ellis Drilling, Inc. 105 ft. 34 ft. 60 gpm. Oil Field Water Supply   Constructed 31-Jan-1981 PDF
T27S, R16W, Sec. 14
NE NW SE
Hendricks, Joe 80 ft. 46 ft.   Domestic   Constructed 28-Jul-1990 PDF
T27S, R16W, Sec. 14
C NW SE
Red Tiger Drilling Co. 100 ft. 27 ft. 60 gpm. Oil Field Water Supply   Constructed 13-Jun-1981 PDF
T27S, R16W, Sec. 14
C NE SE
Red Tiger Drilling Co. 97 ft. 38 ft. 60 gpm. Oil Field Water Supply   Constructed 10-Oct-1981 PDF
T27S, R16W, Sec. 14
C NE NE
White and Ellis Drilling, Inc. 97 ft. 35 ft. 60 gpm. Oil Field Water Supply   Constructed 06-Oct-1981 PDF
T27S, R16W, Sec. 15
SW SW SW
Gabbert-Jones, Inc. 120 ft. 49 ft. 60 gpm. Oil Field Water Supply   Constructed 26-Dec-1984 PDF
T27S, R16W, Sec. 15
SW SW SW
Greensburg Oil Field Serv 120 ft. 80 ft. 100 gpm. Oil Field Water Supply   Constructed 28-Aug-1985 PDF
T27S, R16W, Sec. 15
NW
Shriver, Pauline 157 ft. 31.8 ft.   Irrigation 1 (TH 1-76) Constructed 01-Feb-1976 PDF
T27S, R16W, Sec. 15
C SE SE
Sterling Drilling Co. 80 ft. 32 ft.   (unstated)/abandoned Hendricks 1 Constructed 01-Dec-1980 PDF
T27S, R16W, Sec. 16
C SE
Clark, Cliffton 116 ft. 27.5 ft.   Irrigation   Constructed 22-Mar-1978 PDF
T27S, R16W, Sec. 16
SW SW SE
Clark, Manford 150 ft. 40 ft. 65 gpm. Oil Field Water Supply Clark D 2 Constructed 23-Oct-2003 Scan
T27S, R16W, Sec. 16
SW SW SW
Mull Farms and Feeding 120 ft. 71 ft.   Domestic, Livestock   Constructed 01-Aug-2012 PDF
T27S, R16W, Sec. 17
NW NW SW
Beren Co 70 ft. 26 ft. 100 gpm. Oil Field Water Supply Sneed 1 Constructed 14-Jun-1982 PDF
T27S, R16W, Sec. 17
SW SW SE
Hinshaw, Keith 140 ft. 45 ft.   Domestic   Constructed 03-Mar-1994 PDF
T27S, R16W, Sec. 17
C SE
Hinshaw, Lavern 128 ft. 21 ft. 1200 gpm. Irrigation   Constructed 12-Dec-1975 PDF
T27S, R16W, Sec. 17
NE NE NW NW
Roenbaugh, Jacob 79 ft. 52.3 ft.   Domestic, Livestock   Constructed 14-Dec-2017 PDF
T27S, R16W, Sec. 17
SE NW SW
Sneed, Larry 145 ft. 26 ft. 1500 gpm. Irrigation   Constructed 12-Jan-1977 PDF
T27S, R16W, Sec. 17
NW NW SW
Tuttle, Jerry 78 ft. 26 ft. 100 gpm. Domestic   Constructed 08-Nov-1978 PDF
T27S, R16W, Sec. 18
C SE SW
Red Tiger Drilling Co. 77 ft. 27 ft. 65 gpm. Oil Field Water Supply   Constructed 15-Nov-1977 PDF
T27S, R16W, Sec. 18
SW NE NE
Sneed, Larry 148 ft. 26 ft. 1800 gpm. Irrigation   Constructed 31-Jan-1981 PDF
T27S, R16W, Sec. 18
SE
Tuttle, Gerald 181 ft.     Irrigation   Plugged 24-Mar-1992 PDF
T27S, R16W, Sec. 18
SE
Tuttle, Gerald 180 ft. 43 ft. 1200 gpm. Irrigation   Constructed 07-Apr-1992 PDF
T27S, R16W, Sec. 18
SW SW NE
Whitney, Willard 80 ft. 47 ft. 25 gpm. Domestic   Constructed 31-Mar-1987 PDF
T27S, R16W, Sec. 19
NE NE NW
Jacks, Trent 151 ft. 49 ft. 100 gpm. Domestic, Livestock   Constructed 14-Mar-2014 PDF
View page: 1 || 2 || 3 || 4 || 5 || 6 || 7 || 8 || 9 || 10 || Next >

Kansas Geological Survey
Comments to webadmin@kgs.ku.edu
URL=http://www.kgs.ku.edu/Magellan/WaterWell/index.html
Display Programs Updated July 2, 2014
Data added continuously.