KGS Home Page Water Well Data base County: Seward
Select location of well to view details.
Click on column heading to sort.
Save To File
Water Resources

2961 records. Only 50 records displayed at a time--sort will affect ALL records.
View page: < Prev || 21 || 22 || 23 || 24 || 25 || 26 || 27 || 28 || 29 || 30 || Next >
T-R-S Owner Well Depth
Ascend. Desc.
Static Water Level
Ascend. Desc.
Est. Yield
Ascend. Desc.
Well Use Other ID Action Taken Completion Date
Ascend. Desc.
Scan?
T33S, R32W, Sec. 17
C SE NW
Sage Drilling 200 ft. 62 ft. 60 gpm. Oil Field Water Supply Hern Ranch 1/CWWW 17722 Constructed 03-Nov-1980 PDF
T33S, R32W, Sec. 17
SW
Shirley J. Beaty 1995 Revocable Trust 350 ft. 42 ft. 1200 gpm. Irrigation   Reconstructed 18-Feb-1998 PDF
T33S, R32W, Sec. 18
SW SE NW
Harvey, Wilbur 118 ft. 15 ft.   Irrigation   Constructed 19-Apr-1979 PDF
T33S, R32W, Sec. 18
C SE NE
Rosel, George 100 ft. 11 ft.   Irrigation   Constructed 12-Apr-1977 PDF
T33S, R32W, Sec. 18
NW NE SE NE
Schandler, Rick 130 ft. 27 ft. 50 gpm. Domestic   Constructed 26-Oct-2009 PDF
T33S, R32W, Sec. 19
NW NW SE
Beaty, Shirley J. 260 ft. 120 ft. 50 gpm. Domestic   Constructed 27-Nov-1995 PDF
T33S, R32W, Sec. 19
NE NE
Carlile, Bob 140 ft. 35 ft. 400 gpm. Industrial   Constructed 01-Nov-1976 PDF
T33S, R32W, Sec. 20
SW SE SW
Sage Drilling 240 ft. 65 ft. 60 gpm. Oil Field Water Supply Colburn 1-19 Constructed 19-Jul-1976 PDF
T33S, R32W, Sec. 21
SE SW NW
Andrews, Angus 182 ft. 30 ft.   Other   Constructed 07-Jun-2007 PDF
T33S, R32W, Sec. 21
NW NW NW
Barr, Maurice 175 ft. 31 ft. 1400 gpm. Irrigation   Constructed 30-Aug-1981 PDF
T33S, R32W, Sec. 21
NW NE
Beaty, Shirley 200 ft. 106 ft. 75 gpm. Oil Field Water Supply Colburn 1-21 Constructed 09-Oct-1984 PDF
T33S, R32W, Sec. 21
NW NW NW
Beaty, Shirley J. 170 ft. 35 ft.   Irrigation   Plugged 07-Jan-2000 Scan
T33S, R32W, Sec. 21
NW SE SE
Milhon, Cecil 310 ft. 76 ft. 50 gpm. Domestic, Livestock   Constructed 14-Nov-2017 PDF
T33S, R32W, Sec. 21
NW NW NW
Shirley J. Beaty 1995 Revocable Trust 170 ft. 35 ft.   Irrigation   Constructed 28-May-1999 Scan
T33S, R32W, Sec. 22
SW SW NW
Arkalon Grazing Assoc. 280 ft. 128 ft. 60 gpm. Oil Field Water Supply Ass. 1-22 Constructed 25-May-1984 PDF
T33S, R32W, Sec. 23
NW SE SE
Anadarko Petroleum Corp. 28 ft.     Recovery/Soil Vapor Extraction/Soil Vent SVE Constructed 26-Apr-2004 Scan
T33S, R32W, Sec. 23
SW SE SE SE
Anadarko Petroleum Corporation (reassigned to FCGP site) 35 ft.     Monitoring well/observation/piezometer GMW 10 Constructed 16-Jun-2009 PDF
T33S, R32W, Sec. 23
NW NW SE
Duke Energy 35 ft. 32 ft.   Monitoring well/observation/piezometer MW 1 Constructed 25-Oct-1998 Scan
T33S, R32W, Sec. 23
SE SW SE
Duke Energy 34 ft. 28 ft.   Monitoring well/observation/piezometer MW 5 Constructed 25-Oct-1998 Scan
T33S, R32W, Sec. 23
SW SW SE
Duke Energy 38 ft. 34 ft.   Monitoring well/observation/piezometer MW 4 Constructed 25-Oct-1998 Scan
T33S, R32W, Sec. 23
NW SE SE
Duke Energy 53.5 ft. 45 ft.   Monitoring well/observation/piezometer MW 3 Constructed 25-Oct-1998 Scan
T33S, R32W, Sec. 23
NW SE SE
Duke Energy 49 ft. 42 ft.   Monitoring well/observation/piezometer MW 2 Constructed 25-Oct-1998 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assets, LLC 53 ft.     Test hole/well Soil Boring B11A Constructed 05-Apr-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assets, LLC 53 ft.     Test hole/well Soil Boring B12A Constructed 05-Apr-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assets, LLC 25 ft. 21 ft.   Monitoring well/observation/piezometer MW 8 Constructed 05-Apr-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assets, LLC 30 ft. 24 ft.   Monitoring well/observation/piezometer MW 7 Constructed 05-Apr-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assets, LLC 53 ft.     Test hole/well Soil Boring B11A Plugged 05-Apr-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assets, LLC 53 ft.     Test hole/well Soil Boring B12A Plugged 05-Apr-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assist, L.L.C. 32 ft. 27 ft. 2 gpm. Monitoring well/observation/piezometer PP 5 Constructed 15-May-2002 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assist. LLC 32 ft. 29 ft. 5 gpm. Monitoring well/observation/piezometer DP 3 Constructed 17-Oct-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assist. LLC 31 ft. 28 ft. 5 gpm. Monitoring well/observation/piezometer DP 2 Constructed 17-Oct-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assist. LLC 28 ft. 25 ft. 5 gpm. Monitoring well/observation/piezometer DP 4 Constructed 17-Oct-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assist. LLC 27 ft. 24 ft. 5 gpm. Monitoring well/observation/piezometer DP 1 Constructed 17-Oct-2000 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assist., L.L.C. 32 ft. 27 ft.   Monitoring well/observation/piezometer TW 19 Plugged 14-May-2002 Scan
T33S, R32W, Sec. 23
SE SE SE
Duke Energy Field Services Assist., L.L.C. 32 ft. 27 ft. 2 gpm. Monitoring well/observation/piezometer PP 6 Constructed 15-May-2002 Scan
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 22 ft.     Environmental Remediation, Soil Vapor Extraction SVE 6 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 22.5 ft.     Environmental Remediation, Soil Vapor Extraction SVE 7 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 23.3 ft.     Environmental Remediation, Soil Vapor Extraction SVE 1 Plugged 18-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 23.6 ft.     Environmental Remediation, Soil Vapor Extraction SVE 8 Plugged 18-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 22 ft.     Environmental Remediation, Soil Vapor Extraction SVE 2 Plugged 18-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 29 ft. 25 ft.   Monitoring well/observation/piezometer GMW 4 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 19.5 ft.     Environmental Remediation, Soil Vapor Extraction SVE 5 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 20.4 ft.     Environmental Remediation, Soil Vapor Extraction SVE 4 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 28.3 ft. 24.6 ft.   Monitoring well/observation/piezometer MP 1 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 28.2 ft. 24.6 ft.   Monitoring well/observation/piezometer MP 2 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 25.65 ft. 23.45 ft.   Monitoring well/observation/piezometer MP 3 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 25.65 ft. 23.45 ft.   Monitoring well/observation/piezometer GMW 3 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 28.7 ft. 26.6 ft.   Monitoring well/observation/piezometer MW 9 Plugged 18-Oct-2017 PDF
T33S, R32W, Sec. 23
NW SE SE
Merit Energy 20 ft.     Environmental Remediation, Soil Vapor Extraction SVE 3 Plugged 17-Oct-2017 PDF
T33S, R32W, Sec. 23
SE SE SE SE
Merit Energy (was Anadarko Petroleum) 25 ft.     Environmental Remediation, Soil Vapor Extraction SVE 8 Constructed 25-Jan-2006 PDF
View page: < Prev || 21 || 22 || 23 || 24 || 25 || 26 || 27 || 28 || 29 || 30 || Next >

Kansas Geological Survey
Comments to webadmin@kgs.ku.edu
URL=http://www.kgs.ku.edu/Magellan/WaterWell/index.html
Display Programs Updated July 2, 2014
Data added continuously.